AI 5S + safety audits
Photograph the floor.
Get a 5S plan your team can run today.
5S Visionary reads a phone photo the way a 30-year auditor does: what is out of place, what it costs in man-hours and risk, and the exact fix — scored across the five S's plus safety.
No card, no setup. Upload two photos of your own floor and see the whole diagnosis.
Overall today
58→ 84 after the plan
3 findings · 15 man-hrs/week recoverable · weakest pillar: Sustain
What it does
A walk-round that reads like an auditor wrote it
Photograph a zone from a few angles. The app judges it against world-class 5S practice and returns the diagnosis a plant head can act on the same shift.
Findings on the photo itself
Every issue is boxed on the picture you took — the pallet in the walkway, the unlabelled rack, the cable across the aisle — with what it costs you and the exact fix.
Six scores, not one
Sort, Set in order, Shine, Standardize, Sustain and Safety are scored separately, today versus after the plan. Safety is never averaged away.
A plan you can start today
Prioritised actions with owner, timeframe and impact, plus a buy-list of materials with search terms — floor tape, shadow boards, labels, bins.
Proof it is holding
Every walk-round is logged against the zone, so the next audit shows what stuck, what slipped, and which pillar is holding the score back.
How teams use it
From the shop floor to the plant review, one record
Set the structure once — client, site, department, zone — then every audit lands in the right place with its photos, findings and plan attached.
STEP 1
Photograph the zone
Four corners and one close-up, straight from a phone. No checklist to fill in, no training needed to run it.
STEP 2
Read the diagnosis
Findings on the photo, six pillar scores, the projected score after the plan, and the fixes in priority order.
STEP 3
Fix, then re-audit
Assign owners, close actions, and re-shoot the same zone next week. The trend tells you whether the standard is holding.
Sample audits
The same zone, six weeks apart
Scores move when the actions close — not when the photos look tidier on the day of the audit.
Before
Pallets in the walkway, unlabelled racks, cables across the aisle. Three fixes, all quick wins.
58
After the plan
Marked lanes, labelled bins, shadow boards. The next audit checks that the standard is holding.
84
The score
One shape that shows exactly where the floor leaks time
A single number hides the problem. Six separate scores show the weak pillar — usually Sustain and Standardize — and the dashed shape shows where the zone lands once the plan is closed out.
Start with two photos of your own floor
Create an account, tell us your industry and how often you practise 5S, and the trial opens straight away. Nothing to install, nothing to configure.